UPCOMING NIGHT AND WEEKEND WORKS ON SOUTH ROAD BETWEEN LAMONT STREET AND OVERLAND ROAD – 15/12/2016 – 23/12/2016

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking road preparation and construction works on South Road between Lamont Street and Overland Road.

These works will be undertaken at various times from 7pm Thursday 15 December to 6am Friday 23 December 2016.

Key activities

  • Excavation of pavement, backfill and reinstatement.
  • Removal of existing pavement and asphalt.
  • Installation of kerbing.
  • Asphalting works.

A vacuum truck, excavator, trucks, grader, roller, profiler, water cart, bobcat, concrete machine, asphalting equipment and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic Management

  • Lane and speed restrictions will apply on South Road and Torrens Road at various times, in the vicinity of the works.
  • Traffic signage will alert motorists to the changed traffic conditions.
  • Access to properties will be maintained.

Some noise disturbance can be expected at times while these works are completed, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au