TEMPORARY PARTIAL ROAD CLOSURE: FORSTER STREET AT SOUTH ROAD – 14/08/2016 TO 28/08/2016

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be directional drilling electrical and communication conduits underneath South Road, from Robert Street across to Forster Street.

As a result of these works, Forster Street will be partially closed at South Road for two weeks from
7pm Sunday 14 August 2016 to midnight Sunday 28 August 2016.

To minimise disturbance to residents the works will take place each day between 7am and 5pm. Please note that no works will occur on Sundays.

Key activities

  • Excavation of entry and exit bores.
  • Directional drilling underneath South Road.
  • Installation of conduits.
  • Backfill and reinstate entry and exit bores.

Traffic Management

  • Access into Forster Street from South Road will continue to be provided.
  • No traffic will be able to exit Forster Street at South Road.
  • Traffic wishing to exit onto South Road from Forster Street will be re-directed to Wood Avenue.
  • Pedestrian access will continue to be provided at South Road.
  • Signage will alert motorists to the changed traffic conditions.

For further information about these works, please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au.