As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking lighting and signalling works in the southbound lanes of South Road, through the intersection with Hawker Street.

Due to weather conditions these works were not completed as previously advised. To minimise disturbance to peak hour traffic and weather permitting, the works will now take place from 7pm Friday 20 April to 7pm Saturday 21 April.  


Key activities

  • Signalling and electrical works.

A vacuum truck, excavator, compaction equipment, hand tools, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.


Traffic management

  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Works will be managed to minimise disturbance to local residents however some noise can be expected.