UPDATE ON WORKS FOR GAWLER AVENUE, WEST HINDMARSH – MARCH 2016 – MAY 2016

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing work in Gawler Avenue, West Hindmarsh to install stormwater pipes including the installation of stormwater pits, culverts and conduits.

These works will be occurring intermittently during April and May, 2016 between 7am and 7pm Monday to Friday.

Traffic Management

  • Gawler Avenue will be closed from South Road to Jervois Avenue, with restricted access for local residents only.
  • Residents will be notified should access to driveways be impacted. Steel plates will be used outside of work hours should any trench be left exposed across a driveway. Access arrangements will be discussed in advance with any residents.
  • Signage will alert motorists to the changed traffic conditions.

Opening of Gawler Avenue

Gawler Avenue will not be opening in its final left in / left out arrangement at South Road in April 2016, as previously advised. It is anticipated that Gawler Avenue will remain closed at South Road for ongoing service relation works until a date to be further advised, in May 2016.

We thank you for your patience while these important works are being undertaken.

For further information about these works, please contact us on: 1300 794 899, or email: enquiries@t2talliance.com.