As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing to install a new water main and stormwater infrastructure on Torrens Road between South Road and Wright Street

To minimise disturbance to peak hour traffic, and weather permitting, these works will be undertaken each night between 7pm and 6am from Sunday 4 February to Thursday 8 February (finishing 6am Friday 9 February).

Key activities                                                                                               

  • Excavation and installation of water main.
  • Installation of stormwater pits and pipes.
  • Backfill and reinstatement of pavement.

A road saw, vacuum truck, excavator, trucks, compaction equipment and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

  • Access to some driveways may be temporarily impacted during these works.
  • Residents and business operators will be notified in advance of any works that will have a direct impact, such as temporary driveway restrictions.
  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Works will be managed to minimise disturbance to local residents however some noise can be expected.