UPCOMING NIGHT WORKS, TEMPORARY ROAD CLOSURE FIRST STREET, BROMPTON – 27-28 FEBRUARY 2018

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking electrical works on First Street, near the junction with West Street, Brompton.

To minimise disturbance to peak hour traffic, and weather permitting, these works will be undertaken between 7pm and 6am on Tuesday, 27 February, and Wednesday, 28 February (finishing 6am Thursday, 1 March).

To safely undertake these works, First Street will be temporarily closed near the junction with West Street during this time.

Key activities                                                                                               

  • Excavation of trench
  • Installation of electrical cabling.
  • Backfill and reinstatement of the pavement.

Excavators, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Some noise and vibration can be expected during these works, however, the work will be managed to minimise disturbance to local residents and businesses as much as possible.

Traffic management

  • During the temporary closure of First Street:
    • No through access will be permitted on First Street, across West Street.
    • Access to First Street, between West Street and Chief Street will be provided via Chief Street
    • Traffic wanting to access First Street, west of West Street, will be redirected to Third Street.
  • Signage will alert motorists to the changed traffic conditions.
  • Pedestrian access on First Street will be maintained.

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au