UPCOMING NIGHT WORKS: STORMWATER WORKS- 6/12/2016 – 16/12/2016

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be installing stormwater pits and pipes on the eastern side of South Road between Torrens Road and Forster Street. Multiple crews will be working across various sites within the area to complete the works.

Each night between 7pm and 6am from Tuesday 6 December to Friday 16 December 2016, works will be undertaken on the eastern side of South Road from Torrens Road to Dartmouth Street.

Key activities

  • Cutting of pavement
  • Excavation of a trench
  • Backfill, reinstatement and asphalting.

A saw cutter, vacuum truck, excavator, trucks, light vehicles, roller and compaction equipment will be used to perform these works.  Lighting towers will also be in operation during night works.

Traffic Management

  • Lane and speed restrictions will apply on South Road in the vicinity of the works.
  • Signage will be in place to alert motorists to the changed traffic conditions.
  • Traffic controllers will be in place during the works to assist motorists and residents as required.
  • Business proprietors and residents will be advised in advance should access to their property be impacted during the works.

Some noise disturbance can be expected at times while these works are completed, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works, including the latest traffic arrangements, please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au