UPCOMING NIGHT WORKS ON SOUTH ROAD BETWEEN THE RIVER TORRENS AND HINDMARSH AVENUE, WEST HINDMARSH- 12 – 16 FEBRUARY 2018

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing to install new stormwater infrastructure in several locations on South Road between the River Torrens and Hindmarsh Avenue, West Hindmarsh.

To minimise disturbance to peak hour traffic, and weather permitting, these works will be undertaken each night between 7pm and 6am from Monday 12 February to Friday 16 February (finishing 6am Saturday 17 February).

Key activities                                                                                               

  • Excavation and installation of stormwater pits and pipes.
  • Backfill and reinstatement of pavement.

A road saw, vacuum truck, quick cut, excavator, trucks, compaction equipment and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Works will be managed to minimise disturbance to local residents however some noise can be expected.

For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au

You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au