UPCOMING NIGHT WORKS ON SOUTH ROAD BETWEEN PRINCES STREET AND WILLIAM STREET – 15/12/2016 – 16/12/2016

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be connecting the new sewer main to the existing sewer main. The works will be undertaken within various manholes along South Road between Princes Street and William Street.

To minimise disturbance to traffic, the works will take place between 7pm and 6am on Thursday 15 December and Friday 16 December 2016 (finishing 6am Saturday 17 December 2016). Works will move between manholes, taking approximately three hours in each location to complete the works.

Equipment

A generator and light vehicles will be used to perform these works.

Traffic Management

  • Lane and speed restrictions will apply on South Road at various times, in the vicinity of the works.
  • Traffic signage will alert motorists to the changed traffic conditions.

Some minor noise disturbance can be expected at times while these works are completed, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au