UPCOMING NIGHT WORKS ON SOUTH ROAD BETWEEN MANTON STREET AND  ADAM STREET, HINDMARSH- 27 NOVEMBER – 2 DECEMBER 2017

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing to install new stormwater infrastructure in the southbound lanes of South Road between Manton Street and Adam Street, Hindmarsh.

To minimise disturbance to peak hour traffic, and weather permitting, these works will be undertaken each night between 7pm and 6am from Monday 27 November to Saturday 2 December 2017 (finishing 6am Sunday 3 December).

Key activities                                                                                               

  • Excavation and installation of stormwater infrastructure.
  • Backfill and reinstatement of pavement.

A road saw, vacuum truck, excavator, trucks, compaction equipment and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Works will be managed to minimise disturbance to local residents however some noise can be expected.