UPCOMING NIGHT WORKS ON SOUTH ROAD, CROYDON PARK – 16/05/2017 – 17/05/2017

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be asphalting in the southbound lanes of South Road between Pym Street and Royce Avenue, Croydon Park.

To minimise disturbance to peak hour traffic, and weather permitting, the works will take place between 9pm and 1am on Tuesday 16 May and Wednesday 17 May 2017 (finishing 1am Thursday 18 May 2017).

Key activities                                                                                                                     

  • Removal of existing asphalt
  • Reinstatement of pavement and asphalting

An excavator, bobcat, asphalt paver, compaction equipment, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

  • Access to driveways will be maintained during these works.
  • Lane and speed restrictions will apply on South Road in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Some noise can be expected, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au