As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking piling works on South Road near Princes Street, Croydon between 7pm and 6am from Friday 15 September to Sunday 17 September 2017 (finishing 6am Sunday 17 September).
Key activities
An excavator, piling rig, concrete truck and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.
Traffic management
Noise disturbance and some vibration can be expected intermittently during these works. However, the work will be managed to minimise disturbance to local residents and businesses as much as possible.
For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au