UPCOMING NIGHT WORKS ON SOUTH ROAD- 6 – 7 OCTOBER 2017

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing to install infrastructure for the Intelligent Transport Systems (ITS) on both sides of South Road between Gawler Avenue and Susan Street.

To minimise disturbance to peak hour traffic, and weather permitting, the works will be carried out intermittently each night between 7pm and 6am on Friday 6 October and Saturday 7 October 2017 (finishing 6am Sunday 8 October 2017).

Key activities                                                                                               

  • Excavation works.
  • Installation and concreting of pole footings.

A vacuum truck, auger, concrete mixer, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Works will be managed to minimise disturbance to local residents however some noise can be expected.

For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au

You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au