UPCOMING NIGHT WORKS: SERVICE RELOCATION WORKS ON SOUTH ROAD – 20/12/2016 – 21/12/2016

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking various service relocation works on South Road between Scotia Street and Sunbeam Road.

To minimise disturbance to peak hour traffic, the works will take place each night between 7pm and 6am on Tuesday 20 December and Wednesday 21 December 2016 (finishing at 6am Thursday 22 December 2016)

Key activities

  • Excavation and adjustment of manhole levels.
  • Preparation works for installation of pumping station.
  • Cutting and capping of water mains.

A vacuum truck, road saw, bobcat, excavator, compaction equipment, backhoe, mobile crane, street sweeper and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic Management:

  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will be in place to alert motorists to the changed traffic conditions.
  • Residents will be advised in advance should access to their property be impacted during the works.

Some noise disturbance can be expected, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works, including the latest traffic arrangements, please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au