UPCOMING NIGHT WORKS REQUIRING TEMPORARY ROAD CLOSURE OF ADAM STREET AT SOUTH ROAD, HINDMARSH – 19 – 23 FEBRUARY 2018

As part of the Torrens Road to River Torrens Project, the T2T Alliance is continuing stormwater installation works between the River Torrens and Hindmarsh Avenue, West Hindmarsh.

To minimise disturbance to peak hour traffic, and weather permitting, these works will be undertaken each night between 7pm and 6am from Monday 19 February to Friday 23 February (finishing 6am Saturday 24 February 2018).

To safely undertake these works, Adam Street will be temporarily closed at South Road during the following times:

  • 7pm Tuesday 20 February to 6am Wednesday 21 February.
  • 7pm Wednesday 21 February to 6am Thursday 22 February.
  • 7pm Thursday 22 February to 6am Friday 23 February.

 Key activities                                                                                              

  • Excavation and installation of stormwater pits and pipes.
  • Backfill and reinstatement of pavement.

A road saw, vacuum truck, crane, excavator, trucks, compaction equipment and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

  • During the temporary closure of Adam Street, traffic wanting to enter or exit on to South Road will be redirected to Manton Street or Susan Street.
  • Signage will alert motorists to the changed traffic conditions.
  • Pedestrian access will be maintained on South Road and Adam Street.

For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au

You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au