UPCOMING NIGHT WORKS ON PORT ROAD BETWEEN CATOR STREET AND BERTIE STREET, WEST HINDMARSH, WITH TEMPORARY CLOSURE OF CATOR STREET AT PORT ROAD- 8/5/2017 – 12/5/2017

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking stormwater drainage works prior to pavement and asphalt reinstatement works on Port Road.

To minimise disruption to peak hour traffic, the works will be undertaken each night between

7pm and 6am from Monday 8 May to Friday 12 May 2017 (finishing 6am Friday 12 May 2017).

Key activities

  • Excavation of trench
  • Installation of stormwater drainage
  • Backfill and reinstatement

Equipment

An excavator, vacuum truck, mobile crane, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management:

  • Cator Street will be temporarily closed at the junction with Port Road from 7pm Thursday 11 May to 6am Friday 12 May 2017.
  • Lane and speed restrictions will apply on Port Road between South Road and Bertie Street in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Some noise can be expected, however the works will be managed to minimise disturbance to local residents as much as possible.

For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au. You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au