UPCOMING NIGHT WORKS ON THE WESTERN SIDE OF SOUTH ROAD AT THE JUNCTION OF THOMAS STREET AND HURTLE STREET, CROYDON – 9 AUGUST 2018

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing to install new footpaths at the Thomas Street junction with Hurtle Street, Croydon.

To maximise the opportunity to complete the works with the forecasted dry weather, these works will be undertaken between 7pm and 6am on Thursday 9 August (finishing 6am Friday 10 August).

Key activities                                                                                               

  • Excavation of existing footpath.
  • Installation of new footpath.

An excavator, compaction equipment and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Some noise can be expected, however the work will be managed to minimise disturbance to local residents as much as possible.

Traffic management

  • Alternative detour routes will be in place.
  • Signage will alert motorists to the changed traffic conditions.

 

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au