UPCOMING NIGHT WORKS: INSTALLATION OF TRAFFIC SIGNAL CONDUITS ON SOUTH ROAD – 5/12/2016 – 10/12/2016

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking works to install traffic signal conduits on South Road between Tait Street and Lamont Street, and at the South Road intersection with Torrens Road.

To minimise disturbance to peak hour traffic, the works will take place:

  • South Road between Tait Street and Lamont Street, each night between 7pm and 6am from Monday 5 December to Thursday 8 December 2016 (finishing at 6am Thursday 8 December 2016)
  • South Road intersection with Torrens Road – each night between 7pm and 6am from Thursday 8 December to Saturday 10 December 2016 (finishing 7am Saturday 10 December 2016).

Key activities

  • Excavation and laying of traffic signal conduits.
  • Reinstatement of pavement and footpath and backfill.

A vacuum truck, road saw, excavator, compaction equipment and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic Management:

  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will be in place to alert motorists to the changed traffic conditions.
  • Traffic controllers will be in place during the works to assist motorists and residents as required.
  • Residents will be advised in advance should access to their property be impacted during the works.

Some noise disturbance can be expected, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au

You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au