UPCOMING NIGHT WORKS AT THE SOUTH ROAD INTERSECTION WITH PORT ROAD- 6 – 7 APRIL 2018

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing to install light poles in the northbound lanes of South Road, approaching the intersection with Port Road.

To minimise disturbance to peak hour traffic, and weather permitting, the works will be undertaken from 7pm Friday 6 April to 6am Saturday 7 April.

Key activities

·         Excavation and installation of light poles.

Vacuum truck, backhoe, road saw and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

·           Lane and speed restrictions will apply in the vicinity of the works.

·           Signage will alert motorists to the changed traffic conditions.

Works will be managed to minimise disturbance to local residents however some noise can be expected.

For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au