As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking lighting and signalling works in the southbound lanes of South Road, through the intersection with Hawker Street.
To minimise disturbance to peak hour traffic and weather permitting, the works will take place from 7pm Friday 13 April to 6am Saturday 14 April.
Key activities
A vacuum truck, excavator, compaction equipment, hand tools, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.
Traffic management
Works will be managed to minimise disturbance to local residents however some noise can be expected. For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au
You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au