UPCOMING NIGHT AND WEEKEND WORKS ON SOUTH ROAD BETWEEN PYM STREET AND SUNBEAM ROAD, CROYDON PARK – 17/03/2017 – 20/03/2017 AND 24/03/2017 – 27/03/2017

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking pavement works in preparation for the opening of the new northbound surface road on South Road between Tait Street and Pym Street.

To minimise disturbance to peak hour traffic, the works will take place over two weekends, from:

  • 7pm Friday 17 March to 6am Monday 20 March 2017
  • 7pm Friday 24 March to Monday 27 March 2017

Key activities

  • Installation of kerbing.
  • Asphalting and line marking.

Equipment

A vacuum truck, road saw, excavator, backhoe, asphalt paver, trucks, compaction equipment, line marking equipment and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic Management:

During these works:

  • One lane will be maintained on South Road in both directions between Pym Street and Sunbeam Road.
  • Traffic will be temporarily switched onto the eastern (southbound) side of South Road.
  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will be in place to alert motorists to the changed traffic conditions.

Some noise disturbance can be expected, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au