UPCOMING NIGHT AND WEEKEND WORKS ON SOUTH ROAD BETWEEN PORT ROAD AND MCINNES STREET – 12-18 SEPTEMBER 2017

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking footpath preparation works on the eastern side of South Road between Port Road and McInnes Street each night from 7pm to 6am between Tuesday 12 September 2017 to Monday 18 September 2017 (finishing 6am Monday 18 September).

Key activities

  • Excavation of footpath
  • Backfill with temporary base material
  • Compact footpath in preparation for concreting works

An excavator, loader, tipper truck and compaction equipment will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

These works will be performed behind concrete barriers, with no traffic restrictions in place.

Some noise can be expected, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au