As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking works in various locations at the South Road intersection with Grange Road/Manton Street.
To minimise disturbance to peak hour traffic, the works will take place from:
Key Activities and Locations
A road saw, rock breaker, excavator, vacuum truck, compaction equipment, asphalt layer, light vehicles, trucks and lighting towers will be used to perform these works.
Traffic Management
Some noise disturbance can be expected at times while these works are completed, however the work will be managed to minimise disturbance to local residents as much as possible.
For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au