UPCOMING NIGHT AND WEEKEND WORKS: INSTALLATION OF STORMWATER INFRASTRUCTURE ON SOUTH ROAD, NEAR THE INTERSECTION WITH PORT ROAD – 16/12/2016 – 19/12/2016

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be installing stormwater pipes in the south bound lanes of South Road, near the intersection with Port Road.

To minimise disturbance to peak hour traffic, the works will take place from 7pm Friday 16 December to 6am Monday 19 December 2016.

Key activities

  • Excavation and laying of stormwater pipes.
  • Backfill and reinstatement of pavement.

A vacuum truck, road saw, rock breaker, excavator, mobile crane, compaction equipment and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic Management:

  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will be in place to alert motorists to the changed traffic conditions.
  • Traffic controllers will be in place during the works to assist motorists and residents as required.

Some noise disturbance can be expected, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au