UPCOMING NIGHT AND WEEKEND WORKS AT THE SOUTH ROAD INTERSECTION WITH TORRENS ROAD STARTING 7 MAY FOR THREE WEEKS

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be installing new footpaths around the four corners of the South Road intersection with Torrens Road.

To minimise disturbance to peak hour traffic, and weather permitting, the works will commence Monday 7 May and take approximately three weeks to complete.  

Key activities

  • Removal of existing footpaths
  • Installation of new footpaths

Excavators, vacuum trucks, road saws, compaction equipment, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Works will be managed to minimise disturbance to local residents however some noise can be expected.

For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au

You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au