UPCOMING NIGHT AND WEEKEND WORKS AT THE SOUTH ROAD INTERSECTION WITH TORRENS ROAD, AND ON TORRENS ROAD BETWEEN WRIGHT STREET AND SOUTH ROAD – 27 APRIL – 3 MAY 2018

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing a range of activities at the South Road intersection with Torrens Road, and on Torrens Road between South Road and Wright Street.

To minimise disturbance to peak hour traffic, and weather permitting, the works will be undertaken at the following times:

  • From 7pm Friday 27 April to 6am Monday 30 April.
  • Intermittently each night between 7pm and 6am from Monday 30 April to Wednesday 2 May (finishing 6am Thursday 3 May).

Key activities

  • Installation of new stormwater infrastructure
  • Electrical works

Excavators, vacuum trucks, road saws, compaction equipment, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic management

  • Access to some driveways may be temporarily impacted during these works.
  • Residents and business operators will be notified in advance of any works that will have a direct impact, such as temporary driveway restrictions.
  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Works will be managed to minimise disturbance to local residents however some noise can be expected.

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au