UPCOMING EXCAVATION OF THE LOWERED MOTORWAY, SOUTH ROAD – 31/7/2017 – 5/8/2017 AND 7/8/2017 – 12/8/2017

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing excavation of the lowered motorway, between Port Road and Cedar Avenue.

The works will be undertaken between 7pm and 6am from:

  • Monday 31 July to Saturday 5 August 2017 (finishing 6am Saturday 5 August)
  • Monday 7 August to Saturday 12 August 2017 (finishing 6am Saturday 12 August)

Key activities

  • Excavation and wall trimming

Excavators, loaders and trucks will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic Management

No additional pedestrian or traffic management is required to carry out these works.

Works will be managed to minimise disturbance to local residents however some minor noise can be expected at times.