TEMPORARY ROAD CLOSURE – JUNCTION OF THOMAS AND HURTLE STREETS, CROYDON – 17/7/2017

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking water main infrastructure works at the Thomas Street junction with Hurtle Street, Croydon from 7am to 5pm Monday 17 July 2017.

To safety facilitate these works, the Thomas Street junction with Hurtle Street will be temporarily closed from 7am to 5pm Monday 17 July 2017.

   Traffic Management

  • Alternative detour routes will be in place.
  • Signage will alert motorists to the changed traffic conditions.
  • Pedestrian access will be maintained under traffic control.
  • Access to driveways will be maintained during these works.

Some noise can be expected, however the work will be managed to minimise disturbance to local residents as much as possible.

For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au

You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au