TEMPORARY CLOSURE OF FOOTPATH ON THE EASTERN SIDE OF SOUTH ROAD BETWEEN FORESTER STREET AND MCINNES STREET, RIDLEYTON- FROM FRIDAY 9 NOVEMBER FOR APPROXIMATELY FOUR WEEKS

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking works on the detention basin near Forster Street.

To safely facilitate these works:

  • The footpath on the eastern side of South Road between Forester Street and McInnes Street will be temporarily closed from 7pm Friday 9 November for approximately four weeks.
  • Pedestrian access will not be permitted on this section of South Road at any time during this period.
  • Pedestrian access will be available via the Outer Harbor rail shared use path or via McInnes Street, First Street and Forster Street.
  • Signage will be in place to direct pedestrians to the detour route.

Please call the project enquiry line on: 1300 794 899 or email: enquiries@t2talliance.com.au if you have special access requirements during this temporary footpath closure.

For further project information and the latest traffic arrangements, please visit www.t2talliance.com.au