TEMPORARY CLOSURE OF FOOTPATH ON THE WESTERN SIDE OF SOUTH ROAD BETWEEN GRANGE ROAD AND PORT ROAD, WEST HINDMARSH – 3-25 SEPTEMBER 2017

As part of the Torrens Road to River Torrens Project, the T2T Alliance is installing an Intelligent Transport System (ITS), new kerbing and footpaths and undertaking earthworks in preparation for landscaping, at the southwest corner of the South Road intersection with Port Road..

To safely facilitate these works:

  • The footpath on the western side of South Road between Grange Road and Port Road will be temporarily closed from 7pm Sunday 3 September to 6am Monday 25 September 2017.
  • Pedestrian access will not be permitted on this section of South Road at any time during this period.
  • Pedestrian access will be available via Cator Street.
  • Signage will be in place to direct pedestrians to the detour route.

Please call the project enquiry line on: 1300 794 899 or email: enquiries@t2talliance.com.au if you have special access requirements during this temporary footpath closure.