TEMPORARY CLOSURE OF FOOTPATH ON THE EASTERN SIDE OF SOUTH ROAD BETWEEN ADAM STREET AND 31 SOUTH ROAD, WEST HINDMARSH – 7 MARCH TO LATE MARCH 2018

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be continuing to install new footpaths and kerbing on the eastern side of South Road between Adam Street and 31 South Road (Hindmarsh Plumbing).

To safely facilitate these works:

  • The footpath on the eastern side of South Road between Adam Street and 31 South Road (Hindmarsh Plumbing) will be temporarily closed from 7pm Wednesday 7 March for approximately three weeks.
  • Pedestrian access will not be permitted on this section of South Road at any time during this period.
  • Pedestrian access will be available via Bacon Street.
  • Signage will be in place to direct pedestrians to the detour route.

Please call the project enquiry line on: 1300 794 899 or email: enquiries@t2talliance.com.au if you have special access requirements during this temporary footpath closure.