ROAD WORKS, TEMPORARY PARTIAL CLOSURE OF HAWKER STREET, RIDLEYTON- 5 – 9 NOVEMBER 2018

As part of the Torrens Road to River Torrens Project, the T2T Alliance will be undertaking finishing works at the South Road intersection with Hawker Street, Ridleyton.

To minimise disturbance, and weather permitting, these works will take place intermittently each night between 7pm and 6am from Monday 5 November to Friday 9 November (finishing 6am Saturday 10 November).  

To facilitate these works, Hawker Street will be temporarily partially closed at South Road, from 9pm Friday 9 November to 6am Saturday 10 November.

Key activities   

  • Installation of pedestrian islands and tactile fixing.

Equipment

A road saw, jackhammer, compaction equipment, trucks and light vehicles will be used to perform these works.

Some noise and vibration can be expected during these works, however, the work will be managed to minimise disturbance to local residents and businesses as much as possible.Traffic management

  • Hawker Street will be temporarily partially closed at South Road, from 9pm Friday 9 November to 6am Saturday 10 November.
  • Access from Hawker Street on to South Road will continue to be provided.
  • Motorists on South Road wanting to access Hawker Street will be detoured via Torrens Road or Paget Street during this time.
  • Full access will continue to be provided for Adelaide Metro bus services.
  • Signage will alert motorists to the changed traffic conditions.

For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au

You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au