NIGHT WORKS AND TEMPORARY ROAD CLOSURE OF OVERLAND ROAD AT SOUTH ROAD, CROYDON PARK – 31 JANUARY – 2 FEBRUARY 2018

As part of the Torrens Road to River Torrens Project, the T2T Alliance is continuing to install a new water main on South Road between Pym Street and Overland Road.

To minimise disturbance to peak hour traffic, and weather permitting, night works will be undertaken each night, between 7pm and 6am on Wednesday 31 January and Thursday 1 February (finishing 6am Friday 2 February).

Key activities

  • Excavation
  • Link in of water main
  • Backfill and reinstatement of pavement

Excavators, compacting equipment, a backhoe, vacuum truck, agitator, road saws, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.

Traffic arrangements

  • Overland Road will be temporarily closed on the eastern side of South Road from:
    • 7pm Wednesday 31 January to 5am Thursday 1 February.
    • 7pm Thursday 1 February to 5am Friday 2 February.
  • Lane and speed restrictions will apply in the vicinity of the works.
  • Signage will alert motorists to the changed traffic conditions.

Works will be managed to minimise disturbance to local residents, however some noise and vibration can be expected.

For further information about these works please contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au