As part of the Torrens Road to River Torrens Project, the T2T Alliance will continue installation of a common services trench in the southbound lanes of South Road between Bishop Street and Tait Street, and east along Tait Street for 40 metres from the junction with South Road, Renown ParkPort Road.
To minimise disturbance to peak hour traffic, the works will take place each night between 7pm and 6am from Monday, 9 January, to Friday, 12 January (finishing 6am Saturday, 13 January), weather permitting.
Key activities
A vac truck, excavator, road saw, asphalting equipment, compaction equipment, trucks and light vehicles will be used to perform these works. Lighting towers will also be in operation during night works.
Traffic management
Works will be managed to minimise disturbance to local residents however some noise can be expected.
For further information about these works, including the latest traffic arrangements, please visit www.t2talliance.com.au
You can also contact us on: 1300 794 899, or email at: enquiries@t2talliance.com.au